ROADWAY PROJECTS

 

 
KATY FREEWAY CORRIDOR PROJECT - TxDOT, HOUSTON, TEXAS

AIA was the lead structural engineering firm for the entire Katy Freeway Corridor Project. This project included the reconstruction of approximately 26 overpasses and fully directional interchanges of Beltway 8, IH 610.  AIA revised the bridge layouts and design, provided guidance for design, set design criteria, coordinated aesthetics, participated in public meetings, administered construction phasing and construction cost estimate, and created standards for concrete sign columns for the corridor in accordance with aesthetic requirements. AIA also reviewed and approved all bridge layouts and details. Early coordination with all sections helped in standardizing the bridge details like the inverted T cap dimensions, the column spacing, type and size of foundations, deck drainage and beam spans. We conducted group workshops to provide design guidance and explain design criteria. Review and recommendations helped save significant drilled shaft length on Beltway 8 foundations, and helped reduce the number of expensive steel spans on several direct connectors and braided ramps.

IH-10 and IH 610 Interchange: In addition to the review of all structures, AIA reviewed the schematic and provided recommendations for schematic refinement for the IH 610 and IH –10 ~ 4 level interchange. The purpose of the review was to look for fatal flaws in the constructability, check horizontal and vertical alignments for minimizing direct connector outages, constructability, structure depth, vertical and horizontal clearances, datum differences in different alignments and locations of conflict with existing bents. Results of the review yielded in modifications to structure depths, realignments to IH 610 mainlanes and direct connectors.

Beltway 8 and IH –10 ~ 5 level interchange:  Review included evaluation of the horizontal and vertical alignments for minimizing direct connector outages, constructability, structure depth, vertical and horizontal clearances, datum differences in different alignments and locations of conflict with existing bents. Review yielded in recommendation to add lanes to IH-10 at this interchange and replace existing direct connectors to minimize weaving, increase safety and capacity for the IH-10 mainlanes.

 

WESTPARK TOLLWAY, SECTIONS 2 AND E1, HOUSTON, TEXAS

AIA managed and led the structural design effort for this project which included converting existing overpass at SH 6 to a 3-level grade separation including direct connectors to and from SH 6 with the Westpark Toll Road. Project included design of 3500 feet of mainlane-depressed section of the Westpark Tollway, approximately 2000 LF of entrance and exit ramps, 2000 feet of Alief Clodine, SH 6 northbound and southbound frontage roads. The project also included two bridges for the SH 6 frontage roads over the proposed Tollway, drilled shaft and sheet pile retaining walls, pump station for the depressed section, relocation of 2 ~ 5 x 4 box culverts and intersection design for SH 6 frontage roads and Alief Clodine. Extremely tight right of way, HL&P towers, a 20-inch high-pressure gas line and replacement of foundations of the existing SH 6 Bridge with live traffic added to the complexity of the project.

FM 1488 from FM 2978 to IH 45, -  Montgomery County

This is the first pass through tolling project let in the State of Texas. Project involved widening of a 2 lane rural roadway to a 4 lane roadway with a continuous turn lane for a length of 7 miles. Part of the project was designed as a urban section with storm sewers, curb and gutters while the remaining portion was designed as a rural section with open ditches. Properties adjacent to the highways were getting developed at a rapid pace and required adjustments tot ROW takings and alignments. Two miles of the project went thru a forest area. Several utilities along the project needed adjustment. The project was designed on a fast track and involved coordination with City of Conroe, Montgomery County Transportation Program and TxDOT. Drainage was a challenge considering limited ROW and limited channel work beyond ROW. Incorporated project manual, estimate and quantities and notes for Pass thru financing. Responsible for seven signal layouts and signing and pavement markings for 6.7 miles of roadway.  Project was designed on a fast track. The AIA staff worked closely with all entities to assure on-time project delivery. Signal design included the installation of a video detection system consisting of VIVDS cameras placed at appropriate locations within the intersection.  Intersection design also included elevations, quantities, notes, and the necessary TxDOT standards. 

US 69 – TxDOT, BEAUMONT, TEXAS

AIA was the bridge design task leader for 4 bridges that included 2 bridge widenings and 2 new structures over Rhodair Gully. New bridges were prestressed concrete box beam bridges on a skew.  The bridges were single span 80 feet long prestressed concrete box beam bridges.  Also completed the hydrologic and hydraulic study for the same.  Steep channel banks were designed as retaining walls. Project also included design of 4 soil nail retaining walls for U-turn lanes at SH 347 and at Spurlok Road.

NORTH DIAMONDHEAD BLVD, HOUSTON, TEXAS
Responsible for schematic design of a new roadway to widen the existing facility from two to four lanes divided. The project also included the layout and design of twin bridges.

FUQUA INTERCHANGE, IH-45 AT FUQUA HOUSTON, TEXAS
This 2700 ft. interchange consisted of 21-70 ft. prestressed concrete box beam spans. Approach spans are connected with an intersection steel structure 220' long and 150' wide. The west approach span is a three span continuous steel plate curved girder spans of 110'-1 10'-110'. The east approach span is a continuous three-unit steel plate girder with spans of 122'-122'-122'. The steel girders were all composite design. The abutments were rectangular, reinforced concrete section supported with drilled shafts. AIA recommended use of box beams to reduce construction time and traffic congestion during construction.

FM 1960 WISHBONE INTERCHANGE, IH-45 AT FM 1960, HOUSTON, TEXAS
This FM 1960 Wishbone interchange consisted of 20 prestressed concrete box beam spans of varying lengths and reinforced concrete deck. The abutments were reinforced concrete rectangular beams with drilled shafts. Designed the two 200 ft. long steel continuous straddle bents supported by circular reinforced concrete columns.

HOBBY INTERCHANGE, IH-45 AT MONROE, HOUSTON, TEXAS
This 3300 ft. interchange consisted of 15-70 ft. spans and 10-60 ft. spans of prestressed concrete box beam design connecting to a 228 ft. by 180 ft. curved composite steel girder and stringer structure. The intersection structure was all steel design and included 2000 ft. of retaining wall. The substructure was reinforced concrete construction. The abutment consisted of a rectangular reinforced concrete beam supported with drilled shafts and the bents were cantilevered beam - hammerhead piers, some supported with single columns and others with two columns. Simply supported reinforced concrete beams were also used at some bent locations. AIA recommended the use of box beams to reduce construction time and cost traffic congestion during construction.

US 96 OVER BEAR CREEK, BRIDGE DESIGN DIVISION CONTRACT
Improvements to roadway including a complete schematic with detour for bridge replacement, signing, pavement marking, drainage, bridge design, traffic control, specifications and construction cost estimate.

AIRPORT BOULEVARD OVER SIMS BAYOU, HOUSTON, TEXAS
Design of approach roadway, design of 16-in. waterline aerial crossing, sanitary sewer replacement, intersection re-design, signing and pavement marking, traffic control plans, SW3P, design of 350-ft. long twin bridges, signal layout and temporary signal design.

DESIGN OF N. DIAMONDHEAD BLVD., HOUSTON, TEXAS
Responsible for schematic design of a new roadway to widen the existing facility from two to four lanes divided. The project included the layout and design of twin bridges.

RECONSTRUCTION OF WEST LITTLE YORK ROAD, HOUSTON, TEXAS
Design and plan preparation of widening of 3500-ft. of 2-lane asphalt roadway to a standard boulevard section with two 24-ft concrete curb & gutter lanes and 1200-ft. of asphalt transition divided with a 32-ft. median. The project included pavement design, hydraulic study, preliminary engineering report, storm sewer design, signal modifications at Queenston intersection, construction sequencing, signing/pavement marking, and utilities.

ROUTE 4 CORRIDOR STUDY, BERGEN COUNTY, NEW JERSEY
Transportation planning and engineering services to assist the Bergen County Department of Planning and Economic Development to derive techniques to enhance capacity and improve arterial performance for the Route 4 Corridor situated within the Southeast Bergen Land Use/Transportation Study Area.

FREEWAY MANAGEMENT SYSTEM, PHOENIX, ARIZONA
Member of team working on the design and preparation of plans and specifications for computerized traffic control network, including irrigation facilities along a segment of I-17 and I-10 in Phoenix, Arizona totaling 90 miles. Project involved the use of ATMs and IVHS technologies.

BAYONNE BRIDGE, NEW YORK, NEW YORK
Investigated and developed transportation planning strategies to improve underutilized Bayonne Bridge thus achieving substantial capacity improvements on other Staten Island Bridges. Task also include traffic pattern studies, trailblazer sign master plan, alternate route studies a long major routes in Jersey City (New Jersey) and Staten Island (New York).

ROUTES 70 / ROUTE 73 CORRIDOR STUDY, NEW JERSEY
Performed transportation planning study as part of Project Team studying this major transportation network connecting southern New Jersey with Philadelphia, Pennsylvania. Work included user surveys, data gathering for land use studies and future growth projection analysis for NJDOT.

ROUTE 46 / ROUTE 3 CORRIDOR STUDY, NEW YORK & NEW JERSEY
Performed traffic studies as part of the Project Team analyzing this major east-west transportation network serving northern New Jersey and New York City for the NJDOT. Work involved taking traffic counts both manual and automatic at 17 major intersections and compiling the results.

ROUTE 19 FREEWAY CONNECTOR TO I-80 & PATERSON CBD, PATERSON, NEW YORK
Design of traffic signalization and control for 6 intersections connecting Route 80 and the Route 19 Freeway with the downtown Paterson, New Jersey street network, for the New Jersey Department of Transportation project under Local Aid funding.

ROUTE 58 CORRIDOR STUDY, JONESVILLE TO MARTINSVILLE, VIRGINIA
Route location, corridor study, cost analysis and feasibility study for 240 mile segment of Route 58 in northern VA. AIA's responsibility included traffic data collection at 60 locations, development of alternative alignments and profiles, development of typical cross-sections, participation on Public Information Meetings, identify all bridge/ culvert crossings and preparation of cost estimates.

ROUTE 64 WIDENING, CHESAPEAKE, VIRGINIA
AIA awarded a contract by VDOT to collect and compile data, manual and automatic traffic counts, and compute projects for the design years for 40 locations on heavily traveled industrial route.

RECONSTRUCTION OF LEXINGTON AVENUE, CLIFTON, NEW JERSEY
Prepared the engineering report, preliminary and final design and preparation of plans, specifications and bid documents for the reconstruction on 2-1/2 miles of main arterial roadway in urban area. Work included traffic studies, drainage studies to alleviate area flooding survey, and right-of-way mapping for property acquisitions, maintenance and protection of traffic, cost estimates, construction inspection.

INDEPENDENCE BOULEVARD OVER STAFFORD RUN, MISSOURI CITY, TEXAS
Conducted traffic study and signal design at intersections of Independence Boulevard at FM1092, Fifth Street, and Staffordshire, meeting TxDOT Standard and Missouri City Standard.

MILL BASIN BRIDGE REHABILITATION, BROOKLYN, NEW YORK
Survey of 4000 feet of approach roadway, bridge measurements, preparation of right-of-way documents and design of the roadway approaches along the Belt Parkway for the total rehabilitation of 865 foot, 14 span double leaf trunion bascule bridge over Mill Basin.

GERRITSEN INLET BRIDGE REHABILITATION, BROOKLYN, NEW YORK
Survey of 3500 feet of approach roadway, bridge measurements, preparation of right-of-way documents and design of the roadway approaches along the Belt Parkway for the total rehabilitation of 520 foot long, 105 foot wide eleven span bridge carrying six lanes of the Belt Parkway over Gerritsen Inlet in Brooklyn, New York.

GEORGE WASHINGTON BRIDGE, NEW YORK, NEW YORK
Conducted traffic operations study on George Washington Bridge (GWB) tasks includes the analysis of vehicle running speeds, critical sight distance study at the toll plaza, developing pavement striping plans for toll plaza, maintenance of traffic plans and alternate route study.

PORT AUTHORITY BUS TERMINAL, NEW YORK, NEW YORK
Conducted traffic studies and prepared Phase I & II Reports to analyze, design, and implement manual and electronic traffic control systems for Overheight Vehicle Detection System (OVDS) at the PA Bus Terminal. Study includes evaluation of physical (rigid beam & clinkers) and electrical (Infrared & Photo-Cell) detection systems.

METRO DOWNTOWN STREETS PROJECTS (3), DETAIL DOWNTOWN/MIDTOWN TRAFFIC SIGNAL DESIGN, HOUSTON, TEXAS
Design and preparation of traffic signal and traffic control plans with standard specifications, general layout of future traffic signal communication system, and METRO/City interconnect system in accordance with RCTSS standards/guidelines, of intersections located on Travis Street from Pierce to Commerce, on San Jacinto from Holman to Pierce and from Pierce to Commerce.

ON-CALL TRAFFIC/TRANSPORTATION SERVICES, NEW YORK, NEW YORK
Provided Traffic and transportation studies for thru-ways between New York and New Jersey. Work performed on facilities such as bridges (George Washington, Goethals, Bayonne, Outer), tunnels (Lincoln and Holland), airports (EWR, Laguardia, JFK) and major routes along these facilities. Responsibilities include traffic studies (volume, speed, capacity etc.), transportation planning, maintenance of traffic, signal studies and impact studies.

GESSNER ROAD, CLAY ROAD TO HEMPSTEAD HIGHWAY, HOUSTON, TEXAS
Prepared Sequence of Construction and Traffic Control Plans, designed signals for Gessner Road @ Tanner Road and Gessner Road @ Hempstead Highway to City of Houston design standards.

JEANNETTA ROAD, WESTPARK TO RICHMOND AVENUE, HOUSTON, TEXAS
Designed the signals for Leannetta Road @ Westpark Drive and Richmond Avenue to City of Houston design standards.

LINCOLN TUNNEL - UPPER HELIX STRUCTURE, NEW YORK, NEW YORK
AIA prepared final design plans, specification and estimate associated with the maintenance of traffic portion of the contract drawings for the repair of the east approach span of the upper JFK Blvd. Bridge on the Helix. Prepared striping plans for the rehabilitation of the Helix (PANY & NJ).

GOETHALS BRIDGE, NEW YORK, NEW YORK
AIA prepared final design plans, specification and estimate associated with the maintenance of traffic portion of the contract drawings for the rehabilitation of toll plaza booths and repaint steel-faced curbs at all toll plazas. (PANY & NJ ).

ELLA BOULEVARD - W. LITTLE YORK TO WEST GULF BANK, HOUSTON, TEXAS
Traffic Warrant Study and designed the signals at Gulf Bank, West Little York and West Montgomery. The Gulf Bank signal was to Harris County design standards. West Little York signal, West Montgomery signal and the interconnect to the signal at North Victory was to City of Houston design standards.

ALDINE-WESTFIELD ROAD, TIDWELL TO LITTLE YORK, HOUSTON, TEXAS
Designed the signals for Aldine-Westfield Road @ Park Road and Little York Road to City of Houston design standards.

BELTWAY 8 SOUTH, IH-45 TO SH3, HOUSTON, TEXAS
Prepared final design plans, specifications and estimate associated with the following tasks: thru phase traffic control plans, signing-small and large (overhead structure), pavement markings , signals at SH3, high mast and conventional roadway lighting.

GREENWAY PLAZA (US 59) HOV INTERCHANGE, HOUSTON, TEXAS
PER and final design plans for the freeway, traffic control plan, signals at HOV lane/Edloe and Edloe/Richmond, roadway illumination (high mast and conventional), pavement marking and signing, automatic HOV Lane ramp control gates, and the Edloe street traffic control plans.

BELTWAY 8 SOUTH, IH-45 TO SH 3, HOUSTON, TEXAS
Prepared the High Mast, conventional lighting layouts/circuit diagrams, traffic control plans, two signals on  SH3, signing and pavement markings, overhead and guide sign details.

METRO PARK & RIDE PROJECTS, HOUSTON, TEXAS
Hempstead & Little York Road Katy Freeway (I-10) at State Highway 6 Hillcroft Transit Center at Westpark - Manage the design preparation of signal plans, parking lot pavement markings, traffic flow signs for inside the parking lot, and for the ramps. Interconnect the parking lot exit traffic signal with the existing traffic signal system to maintain the progression of the traffic flow.

NORTHWEST STATION PARK & RIDE, CASTLEBRIDGE HOV LANE, HOUSTON, TEXAS
PER and final design plans for HOV Lane and Castlebridge Street. Traffic signal, traffic control plan, pavement markings and signing, and roadway illumination.

RAMP CONTROL SIGNALS & VERTICAL GATE SYSTEMS, HOUSTON, TEXAS
Performed detail design and engineering support services for the ramp control signal and vertical gate system at six locations. All plans were prepared in accordance with TxDOT (CTMS) Standards and Specifications. The design included geometric changes, CTMS communication cable routing plans, traffic signals, vertical gate, loop detector layouts, and all structural, electro mechanical sign layout and installation details.

REGIONAL COMPUTERIZED TRAFFIC SIGNAL SYSTEM, HOUSTON, TEXAS
Performed data collection for 75 intersections and traffic warrant evaluation for installation of traffic signals located in Zones 1 and 2 of the RCTSS. The data collection involved providing 24- hour traffic counts, turning movement counts at 15-minute intervals, and turning movement diagrams. Traffic signal installation warrants were evaluated along with recommendations for the subject project.

WESTPARK HOV CONNECT & NORTHBOUND FRONTAGE RD, US-59 AT WESTPARK, HOUSTON, TEXAS
Redesigned the Westpark AVL Connector and designed the Northbound Frontage Road Connector, made all revisions to the plan, specifications and estimate that were effected by the design revisions.

 


Copyright © AIA Engineers, Ltd., Houston, Texas USA 2009